| Every
time Tully perform an installation they will produce a method
statement and will assign a project manager. These measures
ensure a safe and efficient installation.
For every Tully installation carried out
a method statement is used. The purpose of a method statement
is to provide a safe system of work for the installation of
the Tully equipment. The method statement is a comprehensive
step-by-step account of the installation work required to
install a Tully Equipment and takes account of the following:
Potential health, safety and environmental risks and
hazards to which Tully staff or subcontractors, Client or
the public may be exposed to whilst the works are carried
out;
risks of damage to Tully plant, Client plant, assets,
structures or infrastructure;
difficulties that may be encountered in conducting
the work;
special plant or procedures needed;
full recognition of Zeag or Client, rules and procedures
or statutory regulations;
how the work is to be conducted to remove or minimise
the hazards, risks and difficulties;
assessment of the way work is to be carried out and
liaison with the Client and other contractors;
any necessary permits or procedures;
Every project carried out is assigned
a Tully Project Manager. The Tully Project Manager is responsible
for:
ensuring a method statement is produced to detail any
work to be undertaken on site;
ensuring that a matrix of works processes and activities,
with associated risks and hazards, is compiled for the work
defined in this method statement;
ensuring the method statement is revised as necessary
(including any relevant addendum), particularly after a variation
to contract has been issued, to cover any new or changed items
of work;
ensuring no work is conducted before receipt of the
Designated Employers Representatives signed assurance (unless
deemed approved) of the method statement and approved access
has been provided;
ensuring that the relevant personnel receive controlled
copies of this method statement.
ensuring that staff are appropriately trained and certified
to conduct the work described in this method statement;
ensuring compliance with this method statement.
ensuring the Client/Project Manager is aware on a daily
basis of works program.
These measures ensure a safe and efficient installation of
your Tully security solution.
|


|